Description
Hornby R40368 East Coast Mk3 Trailer First 41097 – Era 10
Product Info
In-order to allow running at 125 mph on Britain’s railways, new rolling stock was needed by British Railways, and a new Mark entered service in 1975. Significant improvements over the Mk2 included new secondary air suspension between the bogies and the coach body as well as aerodynamic skirting on the underframe. Mk3 Coaches are 75ft (23m) long enabling far greater capacity than older coaches. Mk3 Coaches also incorporate disk brakes and wheel slip protection enabling faster deceleration.
The first Mk3 Coaches to be delivered were used as part of the HST prototype along with the two Class 41 diesel power cars in 1972. Mk3 Coaches entered service in 1975 along with the Class 43 forming the iconic InterCity 125 trainset.
After the HST Mk3 Coach variant was introduced, further Mk3 coaches were introduced to the West Coast Mainline for use as part of locomotive hauled trains. Mark 3s remain in service as part of HSTs with East Coast Trains among other companies.
What’s Inside
Tech Specs
- Item Length – Without Packaging (cm)
- 30.3
- Item Height – Without Packaging (cm)
- 5
- Item Width – Without Packaging (cm)
- 3.5
- Item Weight – Without Packaging
- 0.19
- Item Scale
- 1:76 Scale 00 Gauge
- Finish
- Painted
- Colour
- Grey
- Operator
- East Coast
- Designer
- BREL
- Livery
- East Coast Grey
- Minimum Curve (mm)
- Radius 2
- Number of Parts
- 1