You are here:

Hornby R3838 BR, Standard 2MT, 2-6-0, 78010 – Era 4

Hornby R3838 BR, Standard 2MT, 2-6-0, 78010 – Era 4

Our Price:

£196.99


Saving (£21.00)

1 in stock

Description

Hornby R3838 BR, Standard 2MT, 2-6-0, 78010 – Era 4

Product Info

78010 entered traffic at West Auckland Shed on 24 December 1953 as one of nine 2MT locomotives allocated there for passenger services to Saltburn, Tebay mineral workings over Stainmore summit and the odd excursion working. In March 1955, 78010 was moved to Northallerton shed, displacing the J21, J25 and G5 locomotives on pick up freight workings locally.

 

In March 1963 the locomotive was sent to Polmadie, but was in a poor condition and was transferred on to Motherwell before being returned to Darlington in June that year. 78010 arrived at Farnley Junction in November 1963, before being moved on to Crewe South in April 1964 from where it was withdrawn from service in September 1966.

What’s Inside

1x Locomotive Steam

Tech Specs

Item Length – Without Packaging (cm)
21.5
Item Height – Without Packaging (cm)
5
Item Width – Without Packaging (cm)
3.5
Item Weight – Without Packaging
0.3
Item Scale
1:76 Scale 00 Gauge
License
No
Finish
Painted
Colour
Black
Gauge
OO
DCC Status
DCC Ready 8 pin socket
Operator
British Railways
Designer
Robert Riddles
Wheel Configuration
2-6-0
Livery
Early Crest
Minimum Curve (mm)
Radius 2
Motor
5 Pole Skew wound
Number of Parts
1
Motor
5 pole skew wound
product_hby_dcc_status DCC Ready 8 pin socket

Additional information

Weight 1000 g
Brand

Hornby

Condition

New

Scale

OO/HO Gauge

Format

Steam

Status

DCC Ready

Brand

Hornby

Related Products

🏆 Vote for Us! 🏆

Model Shop of the Year 2025!

We’ve been honoured with a nomination for Hornby Hobbies’ Model Shop of the Year 2025 !  Now, we need your vote to bring home the win! It only takes a moment to vote.